Integrated Sensor Suite Installation ManualFor Vantage Pro2 & Vantage Pro2 Plus Weather Stations™™Davis Instruments, 3465 Diablo Avenue, Hay
Troubleshooting Cabled ISS Communication8Approximately one minute after power-up the outside relative humidity reading should be displayed on the cons
9 Wireless ISS AssemblyThe ISS has a wireless connection to a Vantage Pro2 wireless console. Once the anemometer has been installed and the sensors ha
Verifying Data from the ISS Sensors10Verifying Data from the ISS SensorsUse these steps to verify reception of ISS data at the wireless Vantage Pro2 c
Troubleshooting Wireless ISS Reception11Note: If the LED is flashing rapidly, call Technical Support. See “Contacting Davis Instruments” on page 27 f
Troubleshooting Wireless ISS Reception12Transmitter ID DIP Switches in Top-right Corner of SIMTo change to another ID, use a ballpoint pen or paper cl
13Preparing the ISS for InstallationOnce all the sensors have been connected and communication between the ISS and the console has been successfully e
Prepare the Rain Collector144. While watching the daily rain display, tip the bucket until it drops to the opposite side, then wait two seconds to see
Locating the ISS and Anemometer155. Slide the magnet, exposed end of magnet first, into the open slot of the metric adapter.6. Insert the metric adapt
Locating the ISS and Anemometer16For agricultural applications (Important for evapotranspiration (ET) calculations):• Install the ISS and anemometer a
Locating the ISS and Anemometer17Optional: Anemometer Cable Length Considerations• All Vantage Pro2 stations include a 40' (12 m) cable to go bet
Integrated Sensor Suite Installation ManualRev. E, April 7, 2008Document Part Number: 07395.249For Vantage Pro2 Weather Stations # 6322, 6322C, 6323,
Locating the ISS and Anemometer18• If possible, align the pivot joints of both the ISS and the console antennas so that they are facing each other for
19Installing the ISSThe anemometer and the main part of the ISS can be installed either together as a single unit on a pole, or apart from each other.
Installing the ISS on a Flat Surface20Installation InstructionsThere are several ways to mount and install the ISS unit. The following are installatio
Installing the ISS on a Pole21Option 2: Installing the Anemometer on a Post or Flat Surface 1. With a 3/16" (5 mm) drill bit, drill two holes app
Installing the ISS on a Pole22Guidelines for Installing the ISS on a Pole• When mounting both sides together, remember that whichever side of the ISS
Finishing the Installation233. Tighten the hex nuts using an adjustable wrench or 7/16" wrench. 4. Re-attach the rain collector cone. Set the con
Additional Mounting Options24Extending the Console Cable (Cabled ISS Only)A Cabled ISS can be extended up to 1000' (300 m) away from the console
25Maintenance and TroubleshootingMaintaining UV and Solar Radiation SensorsIf the ISS is a Plus model and contains UV and solar radiation sensors, do
Troubleshooting26Note: For some models of the ISS, the order in which the five radiation shield plates are assembled may be slightly different than t
Troubleshooting27“The wind cups are spinning but my console displays 0 mph.”The signal from the wind cups may not be making it back to the display. Re
1IntroductionThe Integrated Sensor Suite (ISS) collects outside weather data and sends the data to a Vantage Pro2 console or Weather Envoy. Wireless a
28AppendicesAppendix A: Re-orienting the Wind VaneThe Vantage Pro2 station is configured to register wind direction correctly if the anemometer points
Appendix B: Specifications2911. Test the anemometer by pointing the wind vane in any direction and making sure the console displays the correct wind d
SIM Board Display and Contents30SIM Board Display and ContentsSENSOR SENSOR INTERFACE INTERFACE MODULE MODULE UV UV SUN SUN RAIN RAIN WIND WIND TEMP
Preparing the ISS for Installation2Note: If the ISS is a Plus model and contains UV and solar sensors, do not touch the small white diffusers on top
Preparing the ISS for Installation3The steps to prepare the ISS for installation are:• Assemble the anemometer.• Check the factory-installed sensor ca
Check SIM Sensor Connections44. Slide the tooth-lock washer and hex nut onto the machine screw. Tighten the hex nut while holding the screw with a Phi
Check SIM Sensor Connections5Open the SIM Box1. Locate the white box with the solar panel containing the SIM on the front of the ISS unit. The cabled
Check SIM Sensor Connections6Connect the Anemometer Cable to the SIM1. Unwind the coil of cable enough to work with the anemometer. Note: Do not unwi
7Cabled ISS AssemblyThe Cabled ISS system contains a cable for connecting the ISS to a Vantage Pro2 cabled console. Once the anemometer has been insta
Kommentare zu diesen Handbüchern